Carthage College Field House
Kenosha, WI
Bone Dry Pro
Floor Covering: Sports Floor
Moisture Mitigation Products Keep Athletic Flooring in Place
Carthage College is home to a massive field house. The building houses a student fitness center, basketball arena, racquetball courts and other facilities. As with many other construction projects, the school wanted the building completed quickly and on schedule. This left insufficient time for the concrete to cure to the point where moisture levels were low enough for flooring installation.
Lowering moisture levels at the surface of the concrete became an important issue.
Of prime concern were minimizing any costs associated with moisture mitigation and keeping the overall project on track for scheduled completion. Two-part epoxies, which are expensive to purchase and time-consuming to install, were clearly not an option. Fortunately, the crew found Bone Dry Pro.
Backed by a 25-year replacement warranty, Bone Dry Pro protects floors from moisture-related failure.
When properly applied, Bone Dry Pro will provide a permanent, waterproof seal. Moisture will not be able to infiltrate through the slab to destroy the adhesives holding the flooring to the concrete. Bone Dry Pro’s 25-year replacement warranty includes labor and material to replace the finished flooring system, adhesives, and prep material, keeping the floors in Carthage College’s field house protected for decades of student enjoyment.
FEATURED PRODUCTS
Low Cost, Fast Acting Moisture Mitigation Product
Compared with two-part epoxies, the savings with Bone Dry Pro come from the ease and speed of application: a low-pressure spray with a minimal crew, and no grinding or shot blasting on a newly poured slab.
Lowering moisture levels at the surface of the concrete became an important issue.
Your crews don’t need to mix or water down Bone Dry Pro. Just pour it straight into the sprayer and begin misting the concrete slab. The Bone Dry Pro will penetrate through the concrete’s pores, filling voids, reacting with alkali and free lime and turning your slab into a solid, waterproof mass. Under ideal conditions, concrete is waterproofed and ready for flooring installation in just six hours.
Moisture Mitigation Spray Keeps Construction on Schedule and Prevents Costly Fixes
With the speed of installation and waterproofing provided by Bone Dry Pro, construction crews can literally save weeks compared to other moisture mitigation solutions. The critical path of construction can continue on pace for completion, possibly even ahead of schedule.