Miami Dade College Medical Campus
Miami, FL
Bone Dry Pro
New Five-Story Medical Building for Miami Dade College
Miami Dade College is in the process of expanding several of their facilities on their medical campus, in projects that are anticipated to cost $90 million in total. In early, 2018 they began building a new 5-story medical school building for their students. Bone Dry Pro was the moisture mitigation product used to protect the finished flooring from moisture in freshly poured concrete.
With tight construction deadlines, contractors usually don’t have time to waste gathering all the products they need to solve a concrete moisture problem, which is why Bone Dry offers businesses the complete Bone Dry Pro System. Everything contractors and architects need for concrete moisture mitigation can be delivered in one shipment – Bone Dry Pro is mixed with a quick drying agent to reduce curing times, and it has antimicrobial additives to guard against organic growth.
Use Bone Dry Pro for Your Flooring Project
Moisture Mitigation Products
If you’re looking for a high-quality penetrating concrete sealer, all you need to do is call Bone Dry and let us know the square footage, whether the slab is hard troweled, new or existing, and what type of flooring you want to install. We’ll supply the products you need to have your floor installed quickly, easily and with a 20 year warranty against water damage.
Bone Dry is Trusted by Contractors Everywhere
Bone Dry Pro has been used on a wide variety of commercial contracting projects, including the new building at Miami Dade College Medical Campus. Our system’s permanent vapor barrier and deep-penetrating concrete sealer allow for sufficient coverage of your building and at an affordable price.