Roswell Park Cancer Institute

Buffalo, NY

Bone Dry Pro

Renovation and Expansion for a New York Cancer Institute

The Cancer Institute at Roswell Park in Buffalo, NY recently underwent major renovations. They included new flooring in the lobby, a valet area added to the main entrance, a new IMCU added to the 8th floor, new handicapped parking spots added to the parking lot, and a new substation added near the loading dock. All the improvements made to this healthcare facility were done by professional contractors who utilized Bone Dry Pro to seal the concrete substrates.

Bone Dry’s water-based, penetrating concrete sealer with a specialized formula fills the capillaries of concrete surfaces, producing a barrier within the concrete. With tight construction deadlines, architects and contractors don’t have time to waste – Bone Dry Pro can be applied at least an hour after fresh concrete is poured.

Bone Dry Pro and Bone Dry Plus for the Best Building Construction

Our Bone Dry Pro penetrating sealer creates a permanent seal within freshly-poured concrete flooring which minimizes dusting, hardens substrates, and prevents mold and mildew growth. Our Bone Dry Pro sealer can work with tight schedules since it can be applied at least an hour after fresh concrete is poured. Construction teams benefit from the fast and easy application of Bone Dry Pro, and your next project will benefit too.

Bone Dry Plus provides additional protection against mold and organic growth while offering the same permanent moisture mitigation as our other Bone Dry concrete sealers. Bone Dry Plus creates a moisture barrier in concrete substrates to prevent moisture from surfacing, and also contains antimicrobials to prevent mold growth.

Quick Apply Sealer for Faster Results

Speed is another important factor during the expansion of any building. The contractors were able to meet the deadline by using Bone Dry Pro – our sealer’s special formula is designed for application before curing is finished, which is able to cut weeks off the job.

Construct your next building with Bone Dry’s wide range of preparation, sealing, and coating products.

Looking for moisture mitigation backed by an industry leading warranty?

Bone Dry Pro
USGBC

Leed Program Certifications

ieq

IEQ Credit 4.1Low Emitting Materials

ieq

IEQ Credit 4.3VOC free ratings help qualify installations for this credit as part of a flooring system

mr

MR Credit 5Regional Materials–on jobsites within 500 miles from manufacturing location: Kenosha, WI 53144

Sika
AIA
WFCA
NWFA
FCICA